Rainwater harvesting · Noida
Rainwater harvesting in Noida and Greater Noida
Noida and Greater Noida are almost entirely group housing, offices and industrial plots, which are exactly the buildings Uttar Pradesh's rainwater harvesting rule covers. Gautam Buddh Nagar district already pumps out more groundwater than can safely be taken out each year. TerraSetu, an engineering and construction firm based in Gurugram, designs and builds rooftop rainwater harvesting and recharge systems across Noida, and repairs old ones that have stopped working.
Reviewed by Mohit Parmar, Civil Engineer, TerraSetu · Last checked
Why Noida needs it
- The Central Ground Water Board puts Gautam Buddh Nagar district's groundwater use at 105% of what can safely be taken out each year (2025), which it rates over-exploited. See the groundwater page.
- Noida gets about 803 mm of rain in an average year, 82% of it from June to September. A 100 m² roof can put about 68,255 litres a year back into the ground.
The rules in Noida
- Uttar Pradesh requires rainwater harvesting in government buildings and in new buildings above 300 sq m, including group housing and housing schemes. In October 2025 the Chief Minister directed that it be made mandatory for all buildings above 100 sq m, in both urban and rural areas. The implementing bye-law amendment was not confirmed.
- Under the UP Ground Water (Management and Regulation) Act, 2019, commercial, industrial and infrastructure users (RO plants, hotels, hospitals, malls) need an NOC/registration via upgwdonline.in. Penalties are Rs 2-5 lakh and/or 6 months-1 year in jail (Section 39). Domestic borewell rules were not confirmed.
- Read the full rainwater harvesting rules in Uttar Pradesh.
What Noida's buildings need
In the high-rise societies along the Noida Expressway and in Greater Noida West, the system has to handle very large roofs and podiums. That means several recharge points along the boundary road, desilting chambers on the storm drains and a yearly cleaning plan the facility team can follow.
Industrial plots in Noida's phases and in Greater Noida's sectors usually need the recharge system for their groundwater registration as well as for the building plan.
What rainwater harvesting costs in Noida
Priced with 120 ft recharge bores and 803 mm of rain a year. The number of recharge points follows the roof area.
| Building | Roof area | Recharge points | Water put back a year | Cost with GST |
|---|---|---|---|---|
| Independent house | 100 m² (1,076 sq ft) | 1 | 68,255 litres | ₹1.1 lakh to ₹1.7 lakh |
| Large house or villa | 250 m² (2,691 sq ft) | 1 | 1,70,638 litres | ₹1.1 lakh to ₹1.7 lakh |
| Small apartment block or office | 600 m² (6,458 sq ft) | 3 | 4,09,530 litres | ₹3.1 lakh to ₹4.8 lakh |
| Housing society, school or factory | 2,000 m² (21,528 sq ft) | 8 | 13,65,100 litres | ₹8 lakh to ₹12 lakh |
Ranges for budgeting, with filter chamber, pit, media, bore and piping. A site survey fixes the design and the price. See every building size and bore depth on the rainwater harvesting cost page.
How the water travels, from roof to aquifer
Rain on your roof runs to the downpipe. The first-flush diverter throws away the dirtiest first rain, the filter chamber cleans the rest, and the clean water goes into the recharge pit and down the bore to the water-bearing layer. Any extra overflows to the drain.
The standard design we build
Every recharge point we build follows this design. Roof water passes a first-flush diverter that throws away the dirtiest first rain, then a filter chamber, and enters a brick-lined pit filled with boulders, gravel and coarse sand. At the bottom of the pit it goes into a slotted pipe wrapped in mesh, rising to a removable cap at the cover, down a sealed casing to the water-bearing layer your borewell draws from. The drawing below shows the pit and the pipe connection.
The drawing and the bill of quantities below are what you receive before work starts, sized for your roof after the survey. Check them against any other quote line by line.
Sample bill of quantities for one recharge point in Noida
| Item | Quantity | Amount before GST |
|---|---|---|
| Recharge pit 2 × 2 × 2.5 m: excavation, honeycomb brick lining, PCC base, RCC cover with manhole | 1 no. | ₹28,000 to ₹38,000 |
| Pit media: boulders, gravel and coarse sand in layers | 1 pit | ₹8,000 to ₹12,000 |
| Recharge bore, 150 mm, with slotted PVC casing (₹300 to ₹500 a foot) | 120 ft | ₹36,000 to ₹60,000 |
| Filter chamber: gravel, charcoal and sand | 1 no. | ₹12,000 to ₹20,000 |
| Downpipe connections, mesh guards, first-flush diverter and overflow | 1 lot | ₹8,000 to ₹15,000 |
| Total before GST | ₹92,000 to ₹1.4 lakh | |
| Total with 18% GST | ₹1.1 lakh to ₹1.7 lakh |
Civil work at the CPWD Delhi Schedule of Rates 2023 plus 10%, the rest at market rates, with a 120 ft bore. A bigger roof needs more pits, but one filter and pipe set can serve several. Price your own roof with the recharge pit calculator.
Where we work
All of Noida and Greater Noida: the Noida sectors, the Noida Expressway, Greater Noida West, the industrial phases and the Yamuna Expressway sectors. We also work in Delhi, Gurgaon and Faridabad.
Check the numbers for your area
Frequently asked questions
How much does rainwater harvesting cost in Noida?
For a house with a 100 m² roof, about ₹1.1 lakh to ₹1.7 lakh with GST for one recharge point with a 120 ft bore. Societies, offices and factories need several points; see the table above.
Is rainwater harvesting mandatory in Noida?
Uttar Pradesh requires rainwater harvesting in government buildings and in new buildings above 300 sq m, including group housing and housing schemes. In October 2025 the Chief Minister directed that it be made mandatory for all buildings above 100 sq m, in both urban and rural areas. The implementing bye-law amendment was not confirmed.
Who installs rainwater harvesting in Noida?
TerraSetu, a Gurugram engineering firm, surveys, designs and builds rooftop rainwater harvesting and recharge pits in Noida for houses, societies, offices and factories, and repairs old pits that have stopped working.
How long does the work take?
A house takes about a week once the drawing is agreed: two or three days for the pit and filter, a day for the bore, and a day or two for the connections. A society or factory with several points takes two to six weeks.
Our other services
- Rainwater harvesting
Rainwater harvesting design and installation
Rooftop rainwater harvesting by TerraSetu: recharge pits, filters and recharge bores for houses, societies, schools and factories in Delhi NCR. Drawings, BOQ and cost with GST.
- Rainwater harvesting · Delhi
Rainwater harvesting in Delhi
Rainwater harvesting in Delhi by TerraSetu: recharge pits, filters and recharge bores for houses, societies, offices and factories. Cost with GST and the local rules.
- Rainwater harvesting · Gurugram
Rainwater harvesting in Gurgaon (Gurugram)
Rainwater harvesting in Gurgaon (Gurugram) by TerraSetu: recharge pits and bores for houses, societies, offices and factories. Cost with GST, Haryana rules and OC approval.
- Rainwater harvesting · Faridabad
Rainwater harvesting in Faridabad
Rainwater harvesting in Faridabad by TerraSetu: recharge pits, filters and recharge bores for houses, societies, offices and factories. Cost with GST and the local rules.