Rainwater harvesting · Faridabad
Rainwater harvesting in Faridabad
Faridabad draws far more groundwater than rain puts back, and a December 2023 Tribune report found that about 75% of the city's rainwater harvesting systems were not working. Most buildings already have pits on paper; what they need is a system that actually takes water in. TerraSetu, an engineering and construction firm based in Gurugram, designs and builds rooftop rainwater harvesting and recharge systems across Faridabad, and repairs old ones that have stopped working.
Reviewed by Mohit Parmar, Civil Engineer, TerraSetu · Last checked
Why Faridabad needs it
- The Central Ground Water Board puts Faridabad district's groundwater use at 175% of what can safely be taken out each year (2025), which it rates over-exploited. See the groundwater page.
- Faridabad gets about 803 mm of rain in an average year, 82% of it from June to September. A 100 m² roof can put about 68,255 litres a year back into the ground.
The rules in Faridabad
- Under the Haryana Building Code, 2017, roof rainwater harvesting is required inside the plot wherever the rooftop area is 100 sq m or more. Recharge is mandatory for all building types, including group housing on plots over 500 sq m, and for common open areas such as parks and parking. DTCP has made RWH pits a condition for the occupation certificate.
- In CGWA-notified areas, which include Faridabad and Ballabgarh, group housing, institutions, schools, hotels, industries and farmhouses were also directed to adopt rooftop rainwater harvesting.
- Industries, hospitals, schools, hotels and housing societies that use groundwater also need permission from the Haryana Water Resources Authority, which asks for a recharge proposal where water is deeper than 8 m. Read the full rainwater harvesting rules in Haryana.
What Faridabad's buildings need
On the Aravalli side, around Surajkund, Pali and Anangpur, rock is close to the surface and the bore has to be drilled through it to reach water-bearing layers. On the Yamuna side, around Ballabgarh and Tigaon, soil is softer and water is shallower, so pits and shorter bores work.
The city's industrial areas, from Sector 24 to Sector 58 and along the Mathura Road, have large roofs that can put millions of litres a year back into the ground, which is also what their groundwater permission asks for.
What rainwater harvesting costs in Faridabad
Priced with 120 ft recharge bores and 803 mm of rain a year. The number of recharge points follows the roof area.
| Building | Roof area | Recharge points | Water put back a year | Cost with GST |
|---|---|---|---|---|
| Independent house | 100 m² (1,076 sq ft) | 1 | 68,255 litres | ₹1.1 lakh to ₹1.7 lakh |
| Large house or villa | 250 m² (2,691 sq ft) | 1 | 1,70,638 litres | ₹1.1 lakh to ₹1.7 lakh |
| Small apartment block or office | 600 m² (6,458 sq ft) | 3 | 4,09,530 litres | ₹3.1 lakh to ₹4.8 lakh |
| Housing society, school or factory | 2,000 m² (21,528 sq ft) | 8 | 13,65,100 litres | ₹8 lakh to ₹12 lakh |
Ranges for budgeting, with filter chamber, pit, media, bore and piping. A site survey fixes the design and the price. See every building size and bore depth on the rainwater harvesting cost page.
How the water travels, from roof to aquifer
Rain on your roof runs to the downpipe. The first-flush diverter throws away the dirtiest first rain, the filter chamber cleans the rest, and the clean water goes into the recharge pit and down the bore to the water-bearing layer. Any extra overflows to the drain.
The standard design we build
Every recharge point we build follows this design. Roof water passes a first-flush diverter that throws away the dirtiest first rain, then a filter chamber, and enters a brick-lined pit filled with boulders, gravel and coarse sand. At the bottom of the pit it goes into a slotted pipe wrapped in mesh, rising to a removable cap at the cover, down a sealed casing to the water-bearing layer your borewell draws from. The drawing below shows the pit and the pipe connection.
The drawing and the bill of quantities below are what you receive before work starts, sized for your roof after the survey. Check them against any other quote line by line.
Sample bill of quantities for one recharge point in Faridabad
| Item | Quantity | Amount before GST |
|---|---|---|
| Recharge pit 2 × 2 × 2.5 m: excavation, honeycomb brick lining, PCC base, RCC cover with manhole | 1 no. | ₹28,000 to ₹38,000 |
| Pit media: boulders, gravel and coarse sand in layers | 1 pit | ₹8,000 to ₹12,000 |
| Recharge bore, 150 mm, with slotted PVC casing (₹300 to ₹500 a foot) | 120 ft | ₹36,000 to ₹60,000 |
| Filter chamber: gravel, charcoal and sand | 1 no. | ₹12,000 to ₹20,000 |
| Downpipe connections, mesh guards, first-flush diverter and overflow | 1 lot | ₹8,000 to ₹15,000 |
| Total before GST | ₹92,000 to ₹1.4 lakh | |
| Total with 18% GST | ₹1.1 lakh to ₹1.7 lakh |
Civil work at the CPWD Delhi Schedule of Rates 2023 plus 10%, the rest at market rates, with a 120 ft bore. A bigger roof needs more pits, but one filter and pipe set can serve several. Price your own roof with the recharge pit calculator.
Where we work
All of Faridabad: the NIT, the old city, the HSVP sectors, Greater Faridabad, Ballabgarh, the industrial sectors and the Surajkund and Aravalli side. We also work in Gurgaon, Delhi and Noida.
Check the numbers for your area
Frequently asked questions
How much does rainwater harvesting cost in Faridabad?
For a house with a 100 m² roof, about ₹1.1 lakh to ₹1.7 lakh with GST for one recharge point with a 120 ft bore. Societies, offices and factories need several points; see the table above.
Is rainwater harvesting mandatory in Faridabad?
Under the Haryana Building Code, 2017, roof rainwater harvesting is required inside the plot wherever the rooftop area is 100 sq m or more. Recharge is mandatory for all building types, including group housing on plots over 500 sq m, and for common open areas such as parks and parking. DTCP has made RWH pits a condition for the occupation certificate.
Who installs rainwater harvesting in Faridabad?
TerraSetu, a Gurugram engineering firm, surveys, designs and builds rooftop rainwater harvesting and recharge pits in Faridabad for houses, societies, offices and factories, and repairs old pits that have stopped working.
How long does the work take?
A house takes about a week once the drawing is agreed: two or three days for the pit and filter, a day for the bore, and a day or two for the connections. A society or factory with several points takes two to six weeks.
Our other services
- Rainwater harvesting
Rainwater harvesting design and installation
Rooftop rainwater harvesting by TerraSetu: recharge pits, filters and recharge bores for houses, societies, schools and factories in Delhi NCR. Drawings, BOQ and cost with GST.
- Rainwater harvesting · Gurugram
Rainwater harvesting in Gurgaon (Gurugram)
Rainwater harvesting in Gurgaon (Gurugram) by TerraSetu: recharge pits and bores for houses, societies, offices and factories. Cost with GST, Haryana rules and OC approval.
- Rainwater harvesting · Delhi
Rainwater harvesting in Delhi
Rainwater harvesting in Delhi by TerraSetu: recharge pits, filters and recharge bores for houses, societies, offices and factories. Cost with GST and the local rules.
- Rainwater harvesting · Noida
Rainwater harvesting in Noida and Greater Noida
Rainwater harvesting in Noida and Greater Noida by TerraSetu: recharge pits, filters and recharge bores for houses, societies, offices and factories. Cost with GST and the local rules.