Groundwater level in Karur

103%Over-exploited

This area pumps out more water than rain puts back. That is the 2025 stage of groundwater extraction: water pumped out in a year as a share of what rain and other sources safely put back. Up 1 points since 2017.

301 million m³pumped out each year (2025)
292 million m³can be taken out safely each year
9.1 million m³yearly shortfall drawn from stored water
97%goes to irrigation; the rest to homes and industry

Extraction since 2009

Each point is one CGWB assessment. Over-exploited means more water leaves the ground than comes back, so the water table keeps falling. Hover over or tap a point to see why it moved.

0%50%100%150%100%: over-exploited above this line2009201320172020202220232024202590%103%
Safe · up to 70%Semi-critical · 70–90%Critical · 90–100%Over-exploited · above 100%
Show the numbers
YearStagePumped outSafe limitCategoryWhat changed
200990.0%273 million m³303 million m³Semi-criticalFirst assessment in this series.
201397.0%303 million m³313 million m³CriticalPumping up 11% (273 → 303 million m³). Safe limit up 3% (303 → 313 million m³). Main reason: more water was pumped out, mostly for irrigation (263 → 284 million m³).
2017102.4%––Over-exploitedCGWB changed its method in 2017 (GEC-97 to GEC-2015), so part of this change comes from the new method.
2020105.8%289 million m³273 million m³Over-exploitedUp 3 points since 2017.
202295.7%331 million m³346 million m³CriticalPumping up 15% (289 → 331 million m³). Safe limit up 27% (273 → 346 million m³). Main reason: more water soaked back into the ground, from better rain, canals or recharge structures.
202399.1%304 million m³307 million m³CriticalPumping down 8% (331 → 304 million m³). Safe limit down 11% (346 → 307 million m³). Main reason: less water soaked back in, from weaker rain, less canal seepage or more paved ground.
202496.9%298 million m³308 million m³CriticalPumping down 2% (304 → 298 million m³). Safe limit up 0% (307 → 308 million m³).
2025103.1%301 million m³292 million m³Over-exploitedPumping up 1% (298 → 301 million m³). Safe limit down 5% (308 → 292 million m³). Main reason: less water soaked back in, from weaker rain, less canal seepage or more paved ground.

Million m³: 1 million m³ = 100 crore litres. 2009 and 2013 used the older GEC-97 method.

Loading 20 years of rainfall…

Ponds and lakes in Karur

679 of 1,034 water bodies (66%) are not in use: dried up, silted, built over or polluted. Bringing them back is one of the cheapest ways to recharge groundwater.

Loading the census list…

Source: 1st Census of Water Bodies (2018-19), via India-WRIS.

Loading the map of water bodies in Karur…

  • Ponds438
  • Tanks364
  • Lakes38
  • Reservoirs3
  • Check dams and percolation tanks167
  • Others24

Source: 1st Census of Water Bodies, Ministry of Jal Shakti (counted in 2018-19, published 2023).

All about the ponds and lakes in Karur

What will fix it here

Most of the water here goes to farming, so using less on fields matters as much as recharge.

Use less · start here

Switch thirsty crops, water by drip

Where most water goes to fields, moving from paddy and sugarcane to millets, pulses or maize, and from flood to drip or sprinkler irrigation, saves more than any recharge can add.

Recharge · start here

Recharge pits and shafts in open land

Parks, campuses, warehouse yards and road sides can take recharge shafts that reach past the clay layer, so runoff that floods streets goes down to the aquifer instead.

Recharge

Revive village ponds and johads

Desilting old ponds and opening their feeder channels restores natural recharge. A one-hectare pond that soaks in a metre of water over the monsoon puts back about a crore litres.

Recharge

Rooftop rainwater recharge

Pipe roof water through a silt trap and filter into a recharge pit or an old borewell. Every 100 m² of roof puts back tens of thousands of litres a year, right where the pumping happens.

Recharge

Check dams and contour trenches

On sloping or rocky land, small dams on seasonal streams and trenches along contours slow water down long enough for it to sink in.

Use less

Treat and reuse wastewater

Treated water from a sewage treatment plant can run flushing, gardens, cooling towers and construction, which today often draw on borewells.

Frequently asked questions

What is the groundwater level in Karur?

In the 2025 Central Ground Water Board assessment, Karur (Tamil Nadu) pumped out 103% of the groundwater that can be safely taken out each year, which puts it in the "over-exploited" category. That is 1 points higher than in 2017.

Is groundwater in Karur over-exploited?

Yes. Karur takes out more groundwater than rain and other sources put back, so the water table keeps falling.

How can groundwater be recharged in Karur?

Rooftop rainwater harvesting into recharge pits or old borewells, recharge shafts in open land, reviving ponds, check dams, treating and reusing wastewater, and moving farms to drip irrigation and less thirsty crops.

How many ponds and lakes are there in Karur?

The first Census of Water Bodies counted 1,034 water bodies in Karur, including 438 ponds. 679 of them were not in use.