Skip to content
District · Kerala

Groundwater level in Kollam

47%Safe

Groundwater use is within safe limits here. That is the 2025 stage of groundwater extraction: water pumped out in a year as a share of what rain and other sources safely put back. Down 2 points since 2017.

153 million m³pumped out each year (2025)
323 million m³can be taken out safely each year
Noneno yearly shortfall
33%goes to irrigation; the rest to homes and industry

Extraction since 2009

Each point is one CGWB assessment. Over-exploited means more water leaves the ground than comes back, so the water table keeps falling. Hover over or tap a point to see why it moved.

0%50%100%150%100%: over-exploited above this line2009201320172020202220232024202538%47%
Safe · up to 70%Semi-critical · 70–90%Critical · 90–100%Over-exploited · above 100%
Show the numbers
YearStagePumped outSafe limitCategoryWhat changed
200938.0%157 million m³409 million m³SafeFirst assessment in this series.
201345.0%163 million m³365 million m³SafePumping up 4% (157 → 163 million m³). Safe limit down 11% (409 → 365 million m³). Main reason: less water soaked back in, from weaker rain, less canal seepage or more paved ground.
201749.5%165 million m³333 million m³SafePumping up 1% (163 → 165 million m³). Safe limit down 9% (365 → 333 million m³). Main reason: less water soaked back in, from weaker rain, less canal seepage or more paved ground. CGWB changed its method in 2017 (GEC-97 to GEC-2015), so part of this change comes from the new method.
202048.6%165 million m³340 million m³SafePumping up 0% (165 → 165 million m³). Safe limit up 2% (333 → 340 million m³).
202249.9%169 million m³338 million m³SafePumping up 2% (165 → 169 million m³). Safe limit down 1% (340 → 338 million m³).
202351.9%168 million m³323 million m³SafePumping down 0% (169 → 168 million m³). Safe limit down 4% (338 → 323 million m³).
202450.2%170 million m³338 million m³SafePumping up 1% (168 → 170 million m³). Safe limit up 5% (323 → 338 million m³).
202547.3%153 million m³323 million m³SafePumping down 10% (170 → 153 million m³). Safe limit down 4% (338 → 323 million m³).

Million m³: 1 million m³ = 100 crore litres. 2009 and 2013 used the older GEC-97 method.

Loading 20 years of rainfall…

Ponds and lakes in Kollam

508 of 2,352 water bodies (22%) are not in use: dried up, silted, built over or polluted. Bringing them back is one of the cheapest ways to recharge groundwater.

Loading the census list…

Source: 1st Census of Water Bodies (2018-19), via India-WRIS.

Loading the map of water bodies in Kollam…

  • Ponds2,278
  • Tanks37
  • Lakes1
  • Reservoirs1
  • Check dams and percolation tanks15
  • Others20

Source: 1st Census of Water Bodies, Ministry of Jal Shakti (counted in 2018-19, published 2023).

All about the ponds and lakes in Kollam

What will fix it here

Groundwater here is in balance. Keeping it that way means recharging as the area builds up and paves over.

Recharge · start here

Rooftop rainwater recharge

Pipe roof water through a silt trap and filter into a recharge pit or an old borewell. Every 100 m² of roof puts back tens of thousands of litres a year, right where the pumping happens.

Use less · start here

Treat and reuse wastewater

Treated water from a sewage treatment plant can run flushing, gardens, cooling towers and construction, which today often draw on borewells.

Recharge

Recharge pits and shafts in open land

Parks, campuses, warehouse yards and road sides can take recharge shafts that reach past the clay layer, so runoff that floods streets goes down to the aquifer instead.

Use less

Meter borewells and fix leaks

Metered and registered borewells, leak repairs in supply lines and water-efficient fixtures cut pumping without anyone going short.

Recharge

Revive village ponds and johads

Desilting old ponds and opening their feeder channels restores natural recharge. A one-hectare pond that soaks in a metre of water over the monsoon puts back about a crore litres.

Recharge

Permeable paving and green cover

Porous pavers, unpaved tree pits and bioswales along roads let rain soak in instead of racing to the drain.

Frequently asked questions

What is the groundwater level in Kollam?

In the 2025 Central Ground Water Board assessment, Kollam (Kerala) pumped out 47% of the groundwater that can be safely taken out each year, which puts it in the "safe" category. That is 2 points lower than in 2017.

Is groundwater in Kollam over-exploited?

No. At 47% of the safe yield, Kollam is safe, though recharge is still needed as demand grows.

How can groundwater be recharged in Kollam?

Rooftop rainwater harvesting into recharge pits or old borewells, recharge shafts in open land, reviving ponds, check dams, treating and reusing wastewater, and moving farms to drip irrigation and less thirsty crops.

How many ponds and lakes are there in Kollam?

The first Census of Water Bodies counted 2,352 water bodies in Kollam, including 2,278 ponds. 508 of them were not in use.

Other districts in Kerala

Check another place