Skip to content
Free check · Karnataka · sources up to 2023

Is rainwater harvesting mandatory for your building in Karnataka?

Mandatory for sites of 1,200 sq ft (about 111 sq m) and above for new buildings; 2,400 sq ft (about 223 sq m) and above for existing buildings (Bengaluru). Answer a few questions about your plot to see whether it applies to you.

Building

Common buildings in Karnataka

The answer for typical plots, new buildings, roof taken as 70% of the plot. Use the checker for your own sizes.

BuildingAnswer
House on a 100 sq yd (gaj) plotNot mandatory
House on a 200 sq yd plotLikely mandatory
House on a 300 sq yd plotLikely mandatory
Villa on a 500 sq yd plotLikely mandatory
Apartment block on 1,500 m²Likely mandatory
Shop or office on 400 m²Likely mandatory
School on 4,000 m²Check locally
Factory on 10,000 m²Check locally

For an existing building, tick the box in the checker: most rules are written for new buildings.

The rule in Karnataka

In Bengaluru, the BWSSB (Amendment) Act requires rainwater harvesting on existing buildings on sites of 2,400 sq ft (60x40 ft) or more and on new buildings on sites of 1,200 sq ft (30x40 ft) or more. New buildings don't get a water connection without proof of RWH. Homes without RWH pay a penalty of 25% of the monthly water bill for the first three months and 50% after that; non-residential buildings pay 50% and then 100%.

Rainwater harvesting cost in Karnataka

Pick your district for the price of a recharge system for your building.

Frequently asked questions

Is rainwater harvesting mandatory in Karnataka?

Mandatory for sites of 1,200 sq ft (about 111 sq m) and above for new buildings; 2,400 sq ft (about 223 sq m) and above for existing buildings (Bengaluru). In Bengaluru, the BWSSB (Amendment) Act requires rainwater harvesting on existing buildings on sites of 2,400 sq ft (60x40 ft) or more and on new buildings on sites of 1,200 sq ft (30x40 ft) or more. New buildings don't get a water connection without proof of RWH. Homes without RWH pay a penalty of 25% of the monthly water bill for the first three months and 50% after that; non-residential buildings pay 50% and then 100%.

Is rainwater harvesting mandatory for a 200 gaj house in Karnataka?

Most likely yes: rainwater harvesting is required for your building. Bangalore Water Supply and Sewerage (Amendment) Act, 2009/2011; penalty regulations 2015: sites of 1,200 sq ft (about 111 sq m) and above for new buildings; 2,400 sq ft (about 223 sq m) and above for existing buildings (Bengaluru). It applies from a plot area of 111 m² or more; your plot is 167 m².

What is the penalty for not having rainwater harvesting in Karnataka?

Bengaluru: residential 25% of the water bill for the first 3 months, then 50%; non-residential 50%, then 100%. Water and sewer connections are withheld for new buildings.

How do I check if my building in Karnataka needs rainwater harvesting?

Enter your plot area, roof area and number of floors in the checker on this page, in square feet, square yards (gaj) or square metres. It compares them with Karnataka's rule, Bangalore Water Supply and Sewerage (Amendment) Act, 2009/2011; penalty regulations 2015, and tells you whether it applies and why.

Check another state