Skip to content

Pond rejuvenation in Palwal

Palwal has more irrigation tubewells for its size than any other district in Haryana, almost 50 for every square kilometre. Its ponds are large, covering more land than in any other district of the state, and most of them sit in farming villages along the Yamuna and the Agra canal. TerraSetu, an engineering and construction firm based in Gurugram, surveys ponds in Palwal, prepares the DPR and BOQ, desilts and deepens them, builds inlets, banks and ghats, keeps sewage out and hands them back to whoever owns them.

Palwal's ponds in numbers

  • The 1st Census of Water Bodies counted 1,218 water bodies in Palwal district, 1,217 of them ponds. 683 were not in use and 1 were encroached. See them on the ponds page for Palwal.
  • The Haryana Water Resources Atlas 2025 maps 1,288 ponds covering 4,650 acres from satellite data, and counts 66,323 irrigation tubewells in the district.
  • The Central Ground Water Board puts Palwal's groundwater use at 92% of what can safely be taken out each year (2025), which it rates critical. See the groundwater page for Palwal.
  • CGWB's pre-monsoon readings put water at 5–10 m below ground in most of its 12 monitoring wells in Palwal district, from 1.8 m in the shallowest to 18.55 m in the deepest. See the water table page.
  • CGWB's 2023 testing found salt and fluoride above the BIS limit in groundwater samples from the district. See the water quality page.
  • Palwal gets about 737 mm of rain in an average year (2006–2025), 82% of it from June to September. See the rainfall page.

What Palwal's ponds need

Palwal's ponds are big, so earthwork is most of the cost. Silt from these ponds is fertile and farmers in Hodal, Hathin and Hassanpur usually take it for their fields, which brings the price down.

With so many tubewells drawing on the same aquifer, the water table has started to fall, though most wells still read under 10 m. Desilting the bed and cleaning the inlets is usually enough here; deep recharge shafts are rarely needed.

How we rejuvenate a pond in Palwal

  1. Records and survey

    We take the pond's boundary from the revenue records, then GPS-survey the bed levels, silt depth, inlets, outlets, encroachments and every drain that enters it.

  2. Plan where the silt goes

    Before digging starts, we agree with the panchayat and farmers which fields take the silt, since carting is the biggest cost on a large pond.

  3. DPR and BOQ

    Storage before and after, catchment and inflow, drawings, an item-wise cost and a schedule that the owner or a CSR committee can approve. Work out the volumes first with the pond volume calculator.

  4. Desilt, deepen and build

    Excavators remove the silt sealing the bed; clean silt goes to farmers' fields. Then silt traps on every inlet, earthen or stone-pitched banks, ghats and steps.

  5. Plant, fence and hand over

    Plantation, fencing and signboards, then handover with as-built drawings and a yearly upkeep plan.

What pond rejuvenation costs in Palwal

Earthwork is the biggest cost. One acre dug 1 m deeper moves about 4,050 m³ of silt; where farmers nearby take it, carting costs little, and where it must be hauled away, the price rises.

Pond size and workIndicative cost with GST
1 acre, desilt 1 m, inlet silt trap, earthen embankment₹9 lakh to ₹15 lakh
1 acre, desilt 1.5 m, stone pitching on the slopes, one ghat₹20 lakh to ₹31 lakh
3 acres, desilt 1 m, pitching, walkway, wastewater channel₹45 lakh to ₹70 lakh

The same ranges as our pond rejuvenation page, for budgeting. Silt depth, carting distance, sewage diversion and stone pitching move the price most; the survey fixes it.

Who pays for pond work in Palwal

  • Gram panchayats, through MGNREGA for earthwork by village labour and Mission Amrit Sarovar.
  • The Haryana Pond and Waste Water Management Authority, which runs the state's pond revival and treated wastewater programs.
  • The Municipal Council of Palwal for ponds inside the town.
  • CSR: pond revival is a Schedule VII activity for companies. See CSR water conservation projects.

Where we work

All of Palwal district: Palwal, Hodal, Hathin, Hassanpur, Prithla and the villages around them. We also work in Faridabad and Nuh.

Check the numbers for your area

Frequently asked questions

Who does pond rejuvenation in Palwal?

TerraSetu, a Gurugram engineering and construction firm, does pond rejuvenation in Palwal, from the survey and DPR to desilting, sewage diversion, stone work and handover, for gram panchayats, CSR teams, civic bodies and campuses.

How much does pond rejuvenation cost in Palwal?

Most one acre ponds cost ₹9 lakh to ₹31 lakh with GST, depending on silt depth, carting distance and how much stone pitching is needed. A three acre pond with a walkway and a wastewater channel is ₹45 lakh to ₹70 lakh.

How many ponds are there in Palwal?

The 1st Census of Water Bodies counted 1,217 ponds among 1,218 water bodies in Palwal district, and 683 water bodies were not in use. The Haryana Water Resources Atlas 2025 maps 1,288 ponds from satellite data.

Does reviving a pond help groundwater in Palwal?

Yes. Palwal uses 92% of its safe groundwater each year, so a desilted pond with clean inlets puts back water that would otherwise run off or evaporate.

Who gives permission to revive a pond in Palwal?

Village ponds are panchayat land, so the gram panchayat passes a resolution and the work is registered with the block and the Haryana Pond Authority. Ponds inside Palwal town fall under its municipal council.

When should pond work in Palwal start?

Site work takes 6 to 12 weeks for most one to three acre ponds and has to finish before the monsoon reaches Palwal, usually in late June. Start the survey and approvals by January.