Rooftop rainwater recharge
Pipe roof water through a silt trap and filter into a recharge pit or an old borewell. Every 100 m² of roof puts back tens of thousands of litres a year, right where the pumping happens.
Groundwater use is within safe limits here. That is the 2025 stage of groundwater extraction: water pumped out in a year as a share of what rain and other sources safely put back. Down 13 points since 2017.
Each point is one CGWB assessment. Over-exploited means more water leaves the ground than comes back, so the water table keeps falling. Hover over or tap a point to see why it moved.
| Year | Stage | Pumped out | Safe limit | Category | What changed |
|---|---|---|---|---|---|
| 2009 | 46.0% | 14.2 billion m³ | 30.8 billion m³ | Safe | First assessment in this series. |
| 2013 | 44.0% | 8.1 billion m³ | 18.5 billion m³ | Safe | Pumping down 43% (14.2 → 8.1 billion m³). Safe limit down 40% (30.8 → 18.5 billion m³). A swing this large usually comes partly from revised estimates (a new well count or changed district boundaries), not only from changes on the ground. |
| 2017 | 44.1% | 8.9 billion m³ | 20.1 billion m³ | Safe | Pumping up 10% (8.1 → 8.9 billion m³). Safe limit up 9% (18.5 → 20.1 billion m³). CGWB changed its method in 2017 (GEC-97 to GEC-2015), so part of this change comes from the new method. |
| 2020 | 33.3% | 7.6 billion m³ | 22.9 billion m³ | Safe | Pumping down 14% (8.9 → 7.6 billion m³). Safe limit up 14% (20.1 → 22.9 billion m³). Main reason: less water was pumped out. |
| 2022 | 28.8% | 7.5 billion m³ | 25.9 billion m³ | Safe | Pumping down 2% (7.6 → 7.5 billion m³). Safe limit up 13% (22.9 → 25.9 billion m³). Main reason: more water soaked back into the ground, from better rain, canals or recharge structures. |
| 2023 | 28.3% | 7.5 billion m³ | 26.4 billion m³ | Safe | Pumping up 0% (7.5 → 7.5 billion m³). Safe limit up 2% (25.9 → 26.4 billion m³). |
| 2024 | 29.8% | 7.9 billion m³ | 26.4 billion m³ | Safe | Pumping up 5% (7.5 → 7.9 billion m³). Safe limit down 0% (26.4 → 26.4 billion m³). |
| 2025 | 31.5% | 7.9 billion m³ | 25.0 billion m³ | Safe | Pumping up 0% (7.9 → 7.9 billion m³). Safe limit down 5% (26.4 → 25.0 billion m³). |
Million m³: 1 million m³ = 100 crore litres. 2009 and 2013 used the older GEC-97 method.
Loading 20 years of rainfall…
41,498 of 1,90,777 water bodies (22%) are not in use: dried up, silted, built over or polluted. Bringing them back is one of the cheapest ways to recharge groundwater.
Source: 1st Census of Water Bodies, Ministry of Jal Shakti (counted in 2018-19, published 2023).
All about the ponds and lakes in Andhra Pradesh, district by district
Groundwater here is in balance. Keeping it that way means recharging as the area builds up and paves over.
Pipe roof water through a silt trap and filter into a recharge pit or an old borewell. Every 100 m² of roof puts back tens of thousands of litres a year, right where the pumping happens.
Parks, campuses, warehouse yards and road sides can take recharge shafts that reach past the clay layer, so runoff that floods streets goes down to the aquifer instead.
Desilting old ponds and opening their feeder channels restores natural recharge. A one-hectare pond that soaks in a metre of water over the monsoon puts back about a crore litres.
Treated water from a sewage treatment plant can run flushing, gardens, cooling towers and construction, which today often draw on borewells.
On sloping or rocky land, small dams on seasonal streams and trenches along contours slow water down long enough for it to sink in.
Metered and registered borewells, leak repairs in supply lines and water-efficient fixtures cut pumping without anyone going short.
In the 2025 Central Ground Water Board assessment, Andhra Pradesh pumped out 32% of the groundwater that can be safely taken out each year, which puts it in the "safe" category. That is 13 points lower than in 2017.
No. At 32% of the safe yield, Andhra Pradesh is safe, though recharge is still needed as demand grows.
Rooftop rainwater harvesting into recharge pits or old borewells, recharge shafts in open land, reviving ponds, check dams, treating and reusing wastewater, and moving farms to drip irrigation and less thirsty crops.
The first Census of Water Bodies counted 1,90,777 water bodies in Andhra Pradesh, including 14,132 ponds. 41,498 of them were not in use.
Stage of extraction in 2025, most over-pumped first.
Yearly rain at Andhra Pradesh, 2006–2025, from NASA satellite data. Lighter bars are dry years (20% or more below average), when wells are drawn hardest.