Skip to content
District · Assam

Groundwater level in Nalbari

34%Safe

Groundwater use is within safe limits here. That is the 2025 stage of groundwater extraction: water pumped out in a year as a share of what rain and other sources safely put back. Up 8 points since 2017.

115 million m³pumped out each year (2025)
339 million m³can be taken out safely each year
Noneno yearly shortfall
96%goes to irrigation; the rest to homes and industry

Extraction since 2009

Each point is one CGWB assessment. Over-exploited means more water leaves the ground than comes back, so the water table keeps falling. Hover over or tap a point to see why it moved.

0%50%100%150%100%: over-exploited above this line2009201320172020202220232024202554%34%
Safe · up to 70%Semi-critical · 70–90%Critical · 90–100%Over-exploited · above 100%
Show the numbers
YearStagePumped outSafe limitCategoryWhat changed
200954.0%457 million m³849 million m³SafeFirst assessment in this series.
201346.0%205 million m³450 million m³SafePumping down 55% (457 → 205 million m³). Safe limit down 47% (849 → 450 million m³). Main reason: less water was pumped out, mostly for irrigation (430 → 188 million m³). A swing this large usually comes partly from revised estimates (a new well count or changed district boundaries), not only from changes on the ground.
201725.7%87.2 million m³339 million m³SafePumping down 57% (205 → 87 million m³). Safe limit down 25% (450 → 339 million m³). Main reason: less water was pumped out, mostly for irrigation (188 → 72 million m³). A swing this large usually comes partly from revised estimates (a new well count or changed district boundaries), not only from changes on the ground. CGWB changed its method in 2017 (GEC-97 to GEC-2015), so part of this change comes from the new method.
202022.0%85.1 million m³387 million m³SafePumping down 2% (87 → 85 million m³). Safe limit up 14% (339 → 387 million m³). Main reason: more water soaked back into the ground, from better rain, canals or recharge structures.
202224.1%91.6 million m³380 million m³SafePumping up 8% (85 → 92 million m³). Safe limit down 2% (387 → 380 million m³).
202325.2%78.9 million m³313 million m³SafePumping down 14% (92 → 79 million m³). Safe limit down 18% (380 → 313 million m³).
202426.7%79.1 million m³296 million m³SafePumping up 0% (79 → 79 million m³). Safe limit down 5% (313 → 296 million m³).
202534.0%115 million m³339 million m³SafePumping up 45% (79 → 115 million m³). Safe limit up 14% (296 → 339 million m³). Main reason: more water was pumped out, mostly for irrigation (75 → 111 million m³). A swing this large usually comes partly from revised estimates (a new well count or changed district boundaries), not only from changes on the ground.

Million m³: 1 million m³ = 100 crore litres. 2009 and 2013 used the older GEC-97 method.

Loading 20 years of rainfall…

Ponds and lakes in Nalbari

4 of 3,414 water bodies (0%) are not in use: dried up, silted, built over or polluted. Bringing them back is one of the cheapest ways to recharge groundwater.

Loading the census list…

Source: 1st Census of Water Bodies (2018-19), via India-WRIS.

Loading the map of water bodies in Nalbari…

  • Ponds3,405
  • Lakes1
  • Reservoirs3
  • Others5

Source: 1st Census of Water Bodies, Ministry of Jal Shakti (counted in 2018-19, published 2023).

All about the ponds and lakes in Nalbari

What will fix it here

Groundwater here is in balance. Keeping it that way means recharging as the area builds up and paves over.

Use less · start here

Switch thirsty crops, water by drip

Where most water goes to fields, moving from paddy and sugarcane to millets, pulses or maize, and from flood to drip or sprinkler irrigation, saves more than any recharge can add.

Recharge · start here

Revive village ponds and johads

Desilting old ponds and opening their feeder channels restores natural recharge. A one-hectare pond that soaks in a metre of water over the monsoon puts back about a crore litres.

Recharge

Rooftop rainwater recharge

Pipe roof water through a silt trap and filter into a recharge pit or an old borewell. Every 100 m² of roof puts back tens of thousands of litres a year, right where the pumping happens.

Recharge

Recharge pits and shafts in open land

Parks, campuses, warehouse yards and road sides can take recharge shafts that reach past the clay layer, so runoff that floods streets goes down to the aquifer instead.

Recharge

Check dams and contour trenches

On sloping or rocky land, small dams on seasonal streams and trenches along contours slow water down long enough for it to sink in.

Use less

Treat and reuse wastewater

Treated water from a sewage treatment plant can run flushing, gardens, cooling towers and construction, which today often draw on borewells.

Frequently asked questions

What is the groundwater level in Nalbari?

In the 2025 Central Ground Water Board assessment, Nalbari (Assam) pumped out 34% of the groundwater that can be safely taken out each year, which puts it in the "safe" category. That is 8 points higher than in 2017.

Is groundwater in Nalbari over-exploited?

No. At 34% of the safe yield, Nalbari is safe, though recharge is still needed as demand grows.

How can groundwater be recharged in Nalbari?

Rooftop rainwater harvesting into recharge pits or old borewells, recharge shafts in open land, reviving ponds, check dams, treating and reusing wastewater, and moving farms to drip irrigation and less thirsty crops.

How many ponds and lakes are there in Nalbari?

The first Census of Water Bodies counted 3,414 water bodies in Nalbari, including 3,405 ponds. 4 of them were not in use.

Other districts in Assam

Check another place