Skip to content
District · Assam

Groundwater level in Dima Hasao

0.5%Safe

Groundwater use is within safe limits here. That is the 2025 stage of groundwater extraction: water pumped out in a year as a share of what rain and other sources safely put back. Down 20 points since 2017.

2.8 million m³pumped out each year (2025)
566 million m³can be taken out safely each year
Noneno yearly shortfall
14%goes to irrigation; the rest to homes and industry

Extraction since 2013

Each point is one CGWB assessment. Over-exploited means more water leaves the ground than comes back, so the water table keeps falling. Hover over or tap a point to see why it moved.

0%50%100%150%100%: over-exploited above this line201320172020202220232024202515%1%
Safe · up to 70%Semi-critical · 70–90%Critical · 90–100%Over-exploited · above 100%
Show the numbers
YearStagePumped outSafe limitCategoryWhat changed
201315.0%4.8 million m³31.6 million m³SafeFirst assessment in this series.
201720.8%8.3 million m³40.1 million m³SafePumping up 73% (5 → 8 million m³). Safe limit up 27% (32 → 40 million m³). Main reason: more water was pumped out, mostly for irrigation (0 → 3 million m³). A swing this large usually comes partly from revised estimates (a new well count or changed district boundaries), not only from changes on the ground. CGWB changed its method in 2017 (GEC-97 to GEC-2015), so part of this change comes from the new method.
20201.9%7.7 million m³404 million m³SafePumping down 7% (8 → 8 million m³). Safe limit up 908% (40 → 404 million m³). Main reason: more water soaked back into the ground, from better rain, canals or recharge structures. A swing this large usually comes partly from revised estimates (a new well count or changed district boundaries), not only from changes on the ground.
20221.0%5.7 million m³566 million m³SafePumping down 26% (8 → 6 million m³). Safe limit up 40% (404 → 566 million m³). A swing this large usually comes partly from revised estimates (a new well count or changed district boundaries), not only from changes on the ground.
20231.0%5.7 million m³567 million m³SafePumping up 0% (6 → 6 million m³). Safe limit up 0% (566 → 567 million m³).
20241.0%5.7 million m³567 million m³SafePumping up 0% (6 → 6 million m³). Safe limit up 0% (567 → 567 million m³).
20250.5%2.8 million m³566 million m³SafePumping down 51% (6 → 3 million m³). Safe limit down 0% (567 → 566 million m³). A swing this large usually comes partly from revised estimates (a new well count or changed district boundaries), not only from changes on the ground.

Million m³: 1 million m³ = 100 crore litres. 2009 and 2013 used the older GEC-97 method.

Loading 20 years of rainfall…

Ponds and lakes in Dima Hasao

1 of 487 water bodies (0%) is not in use: dried up, silted, built over or polluted. Bringing them back is one of the cheapest ways to recharge groundwater.

Loading the census list…

Source: 1st Census of Water Bodies (2018-19), via India-WRIS.

Loading the map of water bodies in Dima Hasao…

  • Ponds486
  • Others1

Source: 1st Census of Water Bodies, Ministry of Jal Shakti (counted in 2018-19, published 2023).

All about the ponds and lakes in Dima Hasao

What will fix it here

Groundwater here is in balance. Keeping it that way means recharging as the area builds up and paves over.

Recharge · start here

Rooftop rainwater recharge

Pipe roof water through a silt trap and filter into a recharge pit or an old borewell. Every 100 m² of roof puts back tens of thousands of litres a year, right where the pumping happens.

Use less · start here

Treat and reuse wastewater

Treated water from a sewage treatment plant can run flushing, gardens, cooling towers and construction, which today often draw on borewells.

Recharge

Recharge pits and shafts in open land

Parks, campuses, warehouse yards and road sides can take recharge shafts that reach past the clay layer, so runoff that floods streets goes down to the aquifer instead.

Use less

Meter borewells and fix leaks

Metered and registered borewells, leak repairs in supply lines and water-efficient fixtures cut pumping without anyone going short.

Recharge

Revive village ponds and johads

Desilting old ponds and opening their feeder channels restores natural recharge. A one-hectare pond that soaks in a metre of water over the monsoon puts back about a crore litres.

Recharge

Permeable paving and green cover

Porous pavers, unpaved tree pits and bioswales along roads let rain soak in instead of racing to the drain.

Frequently asked questions

What is the groundwater level in Dima Hasao?

In the 2025 Central Ground Water Board assessment, Dima Hasao (Assam) pumped out 1% of the groundwater that can be safely taken out each year, which puts it in the "safe" category. That is 20 points lower than in 2017.

Is groundwater in Dima Hasao over-exploited?

No. At 1% of the safe yield, Dima Hasao is safe, though recharge is still needed as demand grows.

How can groundwater be recharged in Dima Hasao?

Rooftop rainwater harvesting into recharge pits or old borewells, recharge shafts in open land, reviving ponds, check dams, treating and reusing wastewater, and moving farms to drip irrigation and less thirsty crops.

How many ponds and lakes are there in Dima Hasao?

The first Census of Water Bodies counted 487 water bodies in Dima Hasao, including 486 ponds. 1 of them were not in use.

Other districts in Assam

Check another place