Skip to content
District · Karnataka

Groundwater level in Bidar

68%Safe

Groundwater use is within safe limits here. That is the 2025 stage of groundwater extraction: water pumped out in a year as a share of what rain and other sources safely put back. Up 26 points since 2017.

233 million m³pumped out each year (2025)
342 million m³can be taken out safely each year
Noneno yearly shortfall
81%goes to irrigation; the rest to homes and industry

Extraction since 2009

Each point is one CGWB assessment. Over-exploited means more water leaves the ground than comes back, so the water table keeps falling. Hover over or tap a point to see why it moved.

0%50%100%150%100%: over-exploited above this line2009201320172020202220232024202575%68%
Safe · up to 70%Semi-critical · 70–90%Critical · 90–100%Over-exploited · above 100%
Show the numbers
YearStagePumped outSafe limitCategoryWhat changed
200975.0%221 million m³294 million m³Semi-criticalFirst assessment in this series.
201362.0%181 million m³291 million m³SafePumping down 18% (221 → 181 million m³). Safe limit down 1% (294 → 291 million m³). Main reason: less water was pumped out, mostly for irrigation (193 → 161 million m³).
201742.4%153 million m³361 million m³SafePumping down 15% (181 → 153 million m³). Safe limit up 24% (291 → 361 million m³). Main reason: more water soaked back into the ground, from better rain, canals or recharge structures. CGWB changed its method in 2017 (GEC-97 to GEC-2015), so part of this change comes from the new method.
202050.6%131 million m³259 million m³SafePumping down 14% (153 → 131 million m³). Safe limit down 28% (361 → 259 million m³). Main reason: less water soaked back in, from weaker rain, less canal seepage or more paved ground.
202260.3%198 million m³328 million m³SafePumping up 51% (131 → 198 million m³). Safe limit up 27% (259 → 328 million m³). Main reason: more water was pumped out, mostly for irrigation (121 → 155 million m³). A swing this large usually comes partly from revised estimates (a new well count or changed district boundaries), not only from changes on the ground.
202358.6%199 million m³339 million m³SafePumping up 0% (198 → 199 million m³). Safe limit up 3% (328 → 339 million m³).
202460.4%204 million m³338 million m³SafePumping up 3% (199 → 204 million m³). Safe limit down 0% (339 → 338 million m³).
202568.0%233 million m³342 million m³SafePumping up 14% (204 → 233 million m³). Safe limit up 1% (338 → 342 million m³). Main reason: more water was pumped out, mostly for irrigation (160 → 187 million m³).

Million m³: 1 million m³ = 100 crore litres. 2009 and 2013 used the older GEC-97 method.

Loading 20 years of rainfall…

Ponds and lakes in Bidar

730 of 730 water bodies (100%) are not in use: dried up, silted, built over or polluted. Bringing them back is one of the cheapest ways to recharge groundwater.

Loading the census list…

Source: 1st Census of Water Bodies (2018-19), via India-WRIS.

Loading the map of water bodies in Bidar…

  • Ponds67
  • Tanks490
  • Lakes109
  • Reservoirs10
  • Check dams and percolation tanks54

Source: 1st Census of Water Bodies, Ministry of Jal Shakti (counted in 2018-19, published 2023).

All about the ponds and lakes in Bidar

What will fix it here

Groundwater here is in balance. Keeping it that way means recharging as the area builds up and paves over.

Use less · start here

Switch thirsty crops, water by drip

Where most water goes to fields, moving from paddy and sugarcane to millets, pulses or maize, and from flood to drip or sprinkler irrigation, saves more than any recharge can add.

Recharge · start here

Revive village ponds and johads

Desilting old ponds and opening their feeder channels restores natural recharge. A one-hectare pond that soaks in a metre of water over the monsoon puts back about a crore litres.

Recharge

Rooftop rainwater recharge

Pipe roof water through a silt trap and filter into a recharge pit or an old borewell. Every 100 m² of roof puts back tens of thousands of litres a year, right where the pumping happens.

Recharge

Recharge pits and shafts in open land

Parks, campuses, warehouse yards and road sides can take recharge shafts that reach past the clay layer, so runoff that floods streets goes down to the aquifer instead.

Recharge

Check dams and contour trenches

On sloping or rocky land, small dams on seasonal streams and trenches along contours slow water down long enough for it to sink in.

Use less

Treat and reuse wastewater

Treated water from a sewage treatment plant can run flushing, gardens, cooling towers and construction, which today often draw on borewells.

Frequently asked questions

What is the groundwater level in Bidar?

In the 2025 Central Ground Water Board assessment, Bidar (Karnataka) pumped out 68% of the groundwater that can be safely taken out each year, which puts it in the "safe" category. That is 26 points higher than in 2017.

Is groundwater in Bidar over-exploited?

No. At 68% of the safe yield, Bidar is safe, though recharge is still needed as demand grows.

How can groundwater be recharged in Bidar?

Rooftop rainwater harvesting into recharge pits or old borewells, recharge shafts in open land, reviving ponds, check dams, treating and reusing wastewater, and moving farms to drip irrigation and less thirsty crops.

How many ponds and lakes are there in Bidar?

The first Census of Water Bodies counted 730 water bodies in Bidar, including 67 ponds. 730 of them were not in use.

Other districts in Karnataka

Check another place