Skip to content
Rainwater harvesting cost · Lakshadweep

Rainwater harvesting cost in Kavaratti

₹1.1 lakh to ₹1.7 lakhfor a house with a 100 m² roof, GST included

That buys a filter on the downpipe and a recharge pit with a 120 ft recharge bore, which sends about 1,56,315 litres of Kavaratti's rain back into the ground every year. The bore is the biggest cost, so the final price depends on how deep the water-bearing layer is under your plot.

Cost by building size in Kavaratti

Each recharge pit (2 × 2 × 2.5 m with a 120 ft bore) takes the water from a 25 mm downpour on about 280 m² of roof. Bigger roofs need more pits.

BuildingRoof areaRecharge pitsWater put back a yearCost
Independent house100 m² (1,076 sq ft)11,56,315 L₹1.1 lakh to ₹1.7 lakh
Large house or villa250 m² (2,691 sq ft)13,90,788 L₹1.1 lakh to ₹1.7 lakh
Small apartment block or office600 m² (6,458 sq ft)39,37,890 L₹3.1 lakh to ₹4.8 lakh
Housing society, school or factory2,000 m² (21,528 sq ft)831,26,300 L₹8 lakh to ₹12 lakh

How the bore depth changes the price

The same house with a 100 m² roof, with the recharge bore drilled to different depths. The depth is set on site from the soil and water levels.

₹87,000 to ₹1.4 lakhwith a 60 ft bore
₹1.1 lakh to ₹1.7 lakhwith a 120 ft bore
₹1.4 lakh to ₹2.2 lakhwith a 200 ft bore

What is included

ItemRate before GST
Recharge pit 2 × 2 × 2.5 m: digging, brick lining, concrete base and cover with manhole₹28,000 to ₹38,000 each
Filter media in the pit: boulders, gravel and coarse sand₹8,000 to ₹12,000 each
150 mm recharge bore with slotted PVC pipe₹300 to ₹500 a foot
Filter chamber on the roof downpipe (gravel, charcoal and sand)₹12,000 to ₹20,000 each
Downpipe connections, mesh guards, first-flush diverter and overflow₹8,000 to ₹15,000 per building

GST at 18% is added on top. A storage tank for reusing the water, paved-area drains and silt traps cost extra. Prices are TerraSetu's estimates for 2026 and are confirmed after a site survey.

Is it worth it in Kavaratti?

74%Semi-critical

Kavaratti pumps out 74% of the groundwater that can safely be taken out each year (2024, Central Ground Water Board), rated semi-critical. Groundwater is under pressure, and recharge keeps it from tipping over. A house system puts back about 16 water tankers of 10,000 litres a year.

Rainwater harvesting rules in Lakshadweep

No rainwater harvesting mandate for buildings was found for Lakshadweep. A 2013 government reply said the need had not been felt because of the islands' hydrogeology. In 2023, Lakshadweep was one of three States/UTs that had not adopted the RWH provisions of the Model Building Bye-Laws 2016. RWH structures have been built on several islands as government works.

Get a quote in Kavaratti

TerraSetu measures your roof, checks the soil and water level, and gives a fixed price for the system.

Frequently asked questions

What is the cost of rainwater harvesting in Kavaratti?

A rooftop rainwater harvesting system with a recharge pit for a house with a 100 m² (1,076 sq ft) roof costs about ₹1.1 lakh to ₹1.7 lakh in Kavaratti, including GST, with a 120 ft recharge bore. The bore depth makes the biggest difference to the price; larger buildings need more pits.

How much water does rainwater harvesting save in Kavaratti?

Kavaratti gets about 1,839 mm of rain a year, so a 100 m² roof sends about 1,56,315 litres into the ground each year, roughly 16 tankers of 10,000 litres.

How many recharge pits does a building need?

One 2 × 2 × 2.5 m pit with a recharge bore takes the water from a 25 mm downpour on about 280 m² of roof. A house usually needs one pit; a 2,000 m² society roof needs about eight.

How long does it take to install rainwater harvesting?

A house system usually takes three to seven days: a day or two to drill the bore, two or three to build and fill the pit, and a day to connect the downpipes and filter.

Is rainwater harvesting mandatory in Kavaratti?

No rainwater harvesting mandate for buildings was found for Lakshadweep. A 2013 government reply said the need had not been felt because of the islands' hydrogeology. In 2023, Lakshadweep was one of three States/UTs that had not adopted the RWH provisions of the Model Building Bye-Laws 2016. RWH structures have been built on several islands as government works.

Rainwater harvesting cost in other districts of Lakshadweep