Rooftop rainwater recharge
Pipe roof water through a silt trap and filter into a recharge pit or an old borewell. Every 100 m² of roof puts back tens of thousands of litres a year, right where the pumping happens.
Groundwater use is within safe limits here. That is the 2023 stage of groundwater extraction: water pumped out in a year as a share of what rain and other sources safely put back.
Each point is one CGWB assessment. Over-exploited means more water leaves the ground than comes back, so the water table keeps falling. Hover over or tap a point to see why it moved.
| Year | Stage | Pumped out | Safe limit | Category | What changed |
|---|---|---|---|---|---|
| 2023 | 0.1% | 0.2 million m³ | 170 million m³ | Safe | First assessment in this series. |
Million m³: 1 million m³ = 100 crore litres. 2009 and 2013 used the older GEC-97 method.
Loading 20 years of rainfall…
6 of 18 water bodies (33%) are not in use: dried up, silted, built over or polluted. Bringing them back is one of the cheapest ways to recharge groundwater.
Loading the map of water bodies in West Kameng…
Source: 1st Census of Water Bodies, Ministry of Jal Shakti (counted in 2018-19, published 2023).
Groundwater here is in balance. Keeping it that way means recharging as the area builds up and paves over.
Pipe roof water through a silt trap and filter into a recharge pit or an old borewell. Every 100 m² of roof puts back tens of thousands of litres a year, right where the pumping happens.
Treated water from a sewage treatment plant can run flushing, gardens, cooling towers and construction, which today often draw on borewells.
Parks, campuses, warehouse yards and road sides can take recharge shafts that reach past the clay layer, so runoff that floods streets goes down to the aquifer instead.
Metered and registered borewells, leak repairs in supply lines and water-efficient fixtures cut pumping without anyone going short.
Desilting old ponds and opening their feeder channels restores natural recharge. A one-hectare pond that soaks in a metre of water over the monsoon puts back about a crore litres.
Porous pavers, unpaved tree pits and bioswales along roads let rain soak in instead of racing to the drain.
In the 2023 Central Ground Water Board assessment, West Kameng (Arunachal Pradesh) pumped out 0% of the groundwater that can be safely taken out each year, which puts it in the "safe" category.
No. At 0% of the safe yield, West Kameng is safe, though recharge is still needed as demand grows.
Rooftop rainwater harvesting into recharge pits or old borewells, recharge shafts in open land, reviving ponds, check dams, treating and reusing wastewater, and moving farms to drip irrigation and less thirsty crops.
The first Census of Water Bodies counted 18 water bodies in West Kameng, including 15 ponds. 6 of them were not in use.
Yearly rain at West Kameng, 2006–2025, from NASA satellite data. Lighter bars are dry years (20% or more below average), when wells are drawn hardest.