Skip to content
District · Gujarat

Groundwater level in Kheda

41%Safe

Groundwater use is within safe limits here. That is the 2025 stage of groundwater extraction: water pumped out in a year as a share of what rain and other sources safely put back. Down 7 points since 2017.

329 million m³pumped out each year (2025)
794 million m³can be taken out safely each year
Noneno yearly shortfall
89%goes to irrigation; the rest to homes and industry

Extraction since 2009

Each point is one CGWB assessment. Over-exploited means more water leaves the ground than comes back, so the water table keeps falling. Hover over or tap a point to see why it moved.

0%50%100%150%100%: over-exploited above this line2009201320172020202220232024202563%41%
Safe · up to 70%Semi-critical · 70–90%Critical · 90–100%Over-exploited · above 100%
Show the numbers
YearStagePumped outSafe limitCategoryWhat changed
200963.0%502 million m³792 million m³SafeFirst assessment in this series.
201359.0%437 million m³737 million m³SafePumping down 13% (502 → 437 million m³). Safe limit down 7% (792 → 737 million m³). Main reason: less water was pumped out, mostly for irrigation (446 → 372 million m³).
201748.8%326 million m³667 million m³SafePumping down 25% (437 → 326 million m³). Safe limit down 9% (737 → 667 million m³). Main reason: less water was pumped out, mostly for irrigation (372 → 293 million m³). CGWB changed its method in 2017 (GEC-97 to GEC-2015), so part of this change comes from the new method.
202038.2%557 million m³1.5 billion m³SafePumping up 71% (326 → 557 million m³). Safe limit up 119% (0.7 → 1.5 billion m³). Main reason: more water soaked back into the ground, from better rain, canals or recharge structures. A swing this large usually comes partly from revised estimates (a new well count or changed district boundaries), not only from changes on the ground.
202243.5%302 million m³694 million m³SafePumping down 46% (557 → 302 million m³). Safe limit down 52% (1.5 → 0.7 billion m³). Main reason: less water soaked back in, from weaker rain, less canal seepage or more paved ground. A swing this large usually comes partly from revised estimates (a new well count or changed district boundaries), not only from changes on the ground.
202340.3%302 million m³749 million m³SafePumping up 0% (302 → 302 million m³). Safe limit up 8% (694 → 749 million m³). Main reason: more water soaked back into the ground, from better rain, canals or recharge structures.
202438.6%307 million m³794 million m³SafePumping up 1% (302 → 307 million m³). Safe limit up 6% (749 → 794 million m³).
202541.4%329 million m³794 million m³SafePumping up 7% (307 → 329 million m³). Safe limit down 0% (794 → 794 million m³).

Million m³: 1 million m³ = 100 crore litres. 2009 and 2013 used the older GEC-97 method.

Loading 20 years of rainfall…

Ponds and lakes in Kheda

1 of 1,752 water bodies (0%) is not in use: dried up, silted, built over or polluted. Bringing them back is one of the cheapest ways to recharge groundwater.

Loading the census list…

Source: 1st Census of Water Bodies (2018-19), via India-WRIS.

Loading the map of water bodies in Kheda…

  • Ponds451
  • Tanks1,243
  • Lakes3
  • Reservoirs5
  • Check dams and percolation tanks50

Source: 1st Census of Water Bodies, Ministry of Jal Shakti (counted in 2018-19, published 2023).

All about the ponds and lakes in Kheda

What will fix it here

Groundwater here is in balance. Keeping it that way means recharging as the area builds up and paves over.

Use less · start here

Switch thirsty crops, water by drip

Where most water goes to fields, moving from paddy and sugarcane to millets, pulses or maize, and from flood to drip or sprinkler irrigation, saves more than any recharge can add.

Recharge · start here

Revive village ponds and johads

Desilting old ponds and opening their feeder channels restores natural recharge. A one-hectare pond that soaks in a metre of water over the monsoon puts back about a crore litres.

Recharge

Rooftop rainwater recharge

Pipe roof water through a silt trap and filter into a recharge pit or an old borewell. Every 100 m² of roof puts back tens of thousands of litres a year, right where the pumping happens.

Recharge

Recharge pits and shafts in open land

Parks, campuses, warehouse yards and road sides can take recharge shafts that reach past the clay layer, so runoff that floods streets goes down to the aquifer instead.

Recharge

Check dams and contour trenches

On sloping or rocky land, small dams on seasonal streams and trenches along contours slow water down long enough for it to sink in.

Use less

Treat and reuse wastewater

Treated water from a sewage treatment plant can run flushing, gardens, cooling towers and construction, which today often draw on borewells.

Frequently asked questions

What is the groundwater level in Kheda?

In the 2025 Central Ground Water Board assessment, Kheda (Gujarat) pumped out 41% of the groundwater that can be safely taken out each year, which puts it in the "safe" category. That is 7 points lower than in 2017.

Is groundwater in Kheda over-exploited?

No. At 41% of the safe yield, Kheda is safe, though recharge is still needed as demand grows.

How can groundwater be recharged in Kheda?

Rooftop rainwater harvesting into recharge pits or old borewells, recharge shafts in open land, reviving ponds, check dams, treating and reusing wastewater, and moving farms to drip irrigation and less thirsty crops.

How many ponds and lakes are there in Kheda?

The first Census of Water Bodies counted 1,752 water bodies in Kheda, including 451 ponds. 1 of them were not in use.

Other districts in Gujarat

Check another place