Skip to content
District · Rajasthan

Groundwater level in Jalor

178%Over-exploited

This area pumps out 1.8 times the water that rain puts back. That is the 2025 stage of groundwater extraction: water pumped out in a year as a share of what rain and other sources safely put back. Up 1 points since 2017.

796 million m³pumped out each year (2025)
447 million m³can be taken out safely each year
349 million m³yearly shortfall drawn from stored water
94%goes to irrigation; the rest to homes and industry

Extraction since 2009

Each point is one CGWB assessment. Over-exploited means more water leaves the ground than comes back, so the water table keeps falling. Hover over or tap a point to see why it moved.

0%100%200%300%100%: over-exploited above this line20092013201720202022202320242025197%178%
Safe · up to 70%Semi-critical · 70–90%Critical · 90–100%Over-exploited · above 100%
Show the numbers
YearStagePumped outSafe limitCategoryWhat changed
2009197.0%776 million m³393 million m³Over-exploitedFirst assessment in this series.
2013195.0%832 million m³426 million m³Over-exploitedPumping up 7% (776 → 832 million m³). Safe limit up 8% (393 → 426 million m³).
2017177.5%853 million m³480 million m³Over-exploitedPumping up 3% (832 → 853 million m³). Safe limit up 13% (426 → 480 million m³). Main reason: more water soaked back into the ground, from better rain, canals or recharge structures. CGWB changed its method in 2017 (GEC-97 to GEC-2015), so part of this change comes from the new method.
2020188.0%951 million m³506 million m³Over-exploitedPumping up 11% (853 → 951 million m³). Safe limit up 5% (480 → 506 million m³). Main reason: more water was pumped out, mostly for irrigation (809 → 909 million m³).
2022184.5%786 million m³426 million m³Over-exploitedPumping down 17% (951 → 786 million m³). Safe limit down 16% (506 → 426 million m³). Main reason: less water was pumped out, mostly for irrigation (909 → 743 million m³).
2023181.5%795 million m³438 million m³Over-exploitedPumping up 1% (786 → 795 million m³). Safe limit up 3% (426 → 438 million m³). Main reason: more water soaked back into the ground, from better rain, canals or recharge structures.
2024178.2%801 million m³449 million m³Over-exploitedPumping up 1% (795 → 801 million m³). Safe limit up 3% (438 → 449 million m³). Main reason: more water soaked back into the ground, from better rain, canals or recharge structures.
2025178.1%796 million m³447 million m³Over-exploitedPumping down 1% (801 → 796 million m³). Safe limit down 1% (449 → 447 million m³).

Million m³: 1 million m³ = 100 crore litres. 2009 and 2013 used the older GEC-97 method.

Loading 20 years of rainfall…

Ponds and lakes in Jalor

207 of 1,065 water bodies (19%) are not in use: dried up, silted, built over or polluted. Bringing them back is one of the cheapest ways to recharge groundwater.

Loading the census list…

Source: 1st Census of Water Bodies (2018-19), via India-WRIS.

Loading the map of water bodies in Jalor…

  • Ponds529
  • Tanks227
  • Lakes1
  • Reservoirs2
  • Check dams and percolation tanks5
  • Others301

Source: 1st Census of Water Bodies, Ministry of Jal Shakti (counted in 2018-19, published 2023).

All about the ponds and lakes in Jalor

What will fix it here

Most of the water here goes to farming, so using less on fields matters as much as recharge.

Use less · start here

Switch thirsty crops, water by drip

Where most water goes to fields, moving from paddy and sugarcane to millets, pulses or maize, and from flood to drip or sprinkler irrigation, saves more than any recharge can add.

Recharge · start here

Recharge pits and shafts in open land

Parks, campuses, warehouse yards and road sides can take recharge shafts that reach past the clay layer, so runoff that floods streets goes down to the aquifer instead.

Recharge

Revive village ponds and johads

Desilting old ponds and opening their feeder channels restores natural recharge. A one-hectare pond that soaks in a metre of water over the monsoon puts back about a crore litres.

Recharge

Rooftop rainwater recharge

Pipe roof water through a silt trap and filter into a recharge pit or an old borewell. Every 100 m² of roof puts back tens of thousands of litres a year, right where the pumping happens.

Recharge

Check dams and contour trenches

On sloping or rocky land, small dams on seasonal streams and trenches along contours slow water down long enough for it to sink in.

Use less

Treat and reuse wastewater

Treated water from a sewage treatment plant can run flushing, gardens, cooling towers and construction, which today often draw on borewells.

Frequently asked questions

What is the groundwater level in Jalor?

In the 2025 Central Ground Water Board assessment, Jalor (Rajasthan) pumped out 178% of the groundwater that can be safely taken out each year, which puts it in the "over-exploited" category. That is 1 points higher than in 2017.

Is groundwater in Jalor over-exploited?

Yes. Jalor takes out more groundwater than rain and other sources put back, so the water table keeps falling.

How can groundwater be recharged in Jalor?

Rooftop rainwater harvesting into recharge pits or old borewells, recharge shafts in open land, reviving ponds, check dams, treating and reusing wastewater, and moving farms to drip irrigation and less thirsty crops.

How many ponds and lakes are there in Jalor?

The first Census of Water Bodies counted 1,065 water bodies in Jalor, including 529 ponds. 207 of them were not in use.

Other districts in Rajasthan

Check another place