Skip to content
District · Uttar Pradesh

Groundwater level in Amroha

93%Critical

Almost every drop that rain puts back is being pumped out. That is the 2025 stage of groundwater extraction: water pumped out in a year as a share of what rain and other sources safely put back. Down 12 points since 2017.

462 million m³pumped out each year (2025)
496 million m³can be taken out safely each year
Noneno yearly shortfall
87%goes to irrigation; the rest to homes and industry

Extraction since 2009

Each point is one CGWB assessment. Over-exploited means more water leaves the ground than comes back, so the water table keeps falling. Hover over or tap a point to see why it moved.

0%50%100%150%100%: over-exploited above this line20092013201720202022202320242025107%93%
Safe · up to 70%Semi-critical · 70–90%Critical · 90–100%Over-exploited · above 100%
Show the numbers
YearStagePumped outSafe limitCategoryWhat changed
2009107.0%645 million m³605 million m³Over-exploitedFirst assessment in this series.
2013105.0%701 million m³670 million m³Over-exploitedPumping up 9% (645 → 701 million m³). Safe limit up 11% (605 → 670 million m³).
2017104.6%––Over-exploitedCGWB changed its method in 2017 (GEC-97 to GEC-2015), so part of this change comes from the new method.
202096.4%490 million m³508 million m³CriticalDown 8 points since 2017.
202293.9%474 million m³505 million m³CriticalPumping down 3% (490 → 474 million m³). Safe limit down 1% (508 → 505 million m³).
202391.8%673 million m³734 million m³CriticalPumping up 42% (474 → 673 million m³). Safe limit up 45% (505 → 734 million m³). A swing this large usually comes partly from revised estimates (a new well count or changed district boundaries), not only from changes on the ground.
202495.9%482 million m³503 million m³CriticalPumping down 28% (673 → 482 million m³). Safe limit down 31% (734 → 503 million m³). Main reason: less water soaked back in, from weaker rain, less canal seepage or more paved ground. A swing this large usually comes partly from revised estimates (a new well count or changed district boundaries), not only from changes on the ground.
202593.1%462 million m³496 million m³CriticalPumping down 4% (482 → 462 million m³). Safe limit down 1% (503 → 496 million m³).

Million m³: 1 million m³ = 100 crore litres. 2009 and 2013 used the older GEC-97 method.

Loading 20 years of rainfall…

Ponds and lakes in Amroha

1,390 of 1,456 water bodies (95%) are not in use: dried up, silted, built over or polluted. Bringing them back is one of the cheapest ways to recharge groundwater.

Loading the census list…

Source: 1st Census of Water Bodies (2018-19), via India-WRIS.

Loading the map of water bodies in Amroha…

  • Ponds1,447
  • Tanks7
  • Lakes2

Source: 1st Census of Water Bodies, Ministry of Jal Shakti (counted in 2018-19, published 2023).

All about the ponds and lakes in Amroha

What will fix it here

Most of the water here goes to farming, so using less on fields matters as much as recharge.

Use less · start here

Switch thirsty crops, water by drip

Where most water goes to fields, moving from paddy and sugarcane to millets, pulses or maize, and from flood to drip or sprinkler irrigation, saves more than any recharge can add.

Recharge · start here

Recharge pits and shafts in open land

Parks, campuses, warehouse yards and road sides can take recharge shafts that reach past the clay layer, so runoff that floods streets goes down to the aquifer instead.

Recharge

Revive village ponds and johads

Desilting old ponds and opening their feeder channels restores natural recharge. A one-hectare pond that soaks in a metre of water over the monsoon puts back about a crore litres.

Recharge

Rooftop rainwater recharge

Pipe roof water through a silt trap and filter into a recharge pit or an old borewell. Every 100 m² of roof puts back tens of thousands of litres a year, right where the pumping happens.

Recharge

Check dams and contour trenches

On sloping or rocky land, small dams on seasonal streams and trenches along contours slow water down long enough for it to sink in.

Use less

Treat and reuse wastewater

Treated water from a sewage treatment plant can run flushing, gardens, cooling towers and construction, which today often draw on borewells.

Frequently asked questions

What is the groundwater level in Amroha?

In the 2025 Central Ground Water Board assessment, Amroha (Uttar Pradesh) pumped out 93% of the groundwater that can be safely taken out each year, which puts it in the "critical" category. That is 12 points lower than in 2017.

Is groundwater in Amroha over-exploited?

Not yet, but it is critical: 93% of the safe yield is already used.

How can groundwater be recharged in Amroha?

Rooftop rainwater harvesting into recharge pits or old borewells, recharge shafts in open land, reviving ponds, check dams, treating and reusing wastewater, and moving farms to drip irrigation and less thirsty crops.

How many ponds and lakes are there in Amroha?

The first Census of Water Bodies counted 1,456 water bodies in Amroha, including 1,447 ponds. 1,390 of them were not in use.

Other districts in Uttar Pradesh

Check another place